Installation

AAPG doesn't stop at the loading dock. Our project managers, superintendents and installation crews take your millwork from shop drawings to final punch list, nationwide.

One team from drawings to punch list

Every package is detailed in house with shop drawings and engineered for site fit. Pieces are pre-assembled where practical, so less work happens in the field.

How a project runs

  • Design assist and value engineering with your architect
  • Shop drawings, samples and submittals
  • Fabrication in our shops and with trusted manufacturing partners
  • Packaging and direct-to-jobsite delivery, sequenced to your schedule
  • Installation by AAPG crews led by an AAPG superintendent
  • Punch list, closeout and warranty

What we install

Wall panel systems, wall protection, ceilings and acoustics, exterior cladding, casework and countertops, lockers, restroom compartments and architectural trim.

Site conditions

Millwork ships after wet work in the building is finished and is stored in dry, conditioned space and acclimated before installation. Our environmental requirements sheet in Resources lists the details your team needs.